Inflexion
Finish Prime Grade Oak Parquet
Location Mayfair
This was a project set over 4 floors in the prestigious area of Mayfair where Dyfed Richards firstly laid a plywood subfloor followed by 250m² of Prime Grade Oak Parquet.
In the Reception Area we laid 45m² of Prime Grade Oak Versaille panels finished all floors using Osmo Poly X Satin Oil. Additionally, we also supplied and installed all of the plaster coving, 2500 linear metres of mouldings on the wall, twenty internal doors (including the very wide frames), and lastly four external French doors.